{"id":2575,"date":"2020-08-24T11:44:45","date_gmt":"2020-08-24T11:44:45","guid":{"rendered":"https:\/\/www.icsr.co.uk\/?post_type=project&p=2575"},"modified":"2021-11-05T10:01:51","modified_gmt":"2021-11-05T10:01:51","slug":"support-preparing-for-introduction-of-operational-resilience-business-continuity-planning","status":"publish","type":"project","link":"https:\/\/www.icsr.co.uk\/project\/support-preparing-for-introduction-of-operational-resilience-business-continuity-planning\/","title":{"rendered":"Support Preparing For Introduction of Operational Resilience and Business Continuity Planning"},"content":{"rendered":"

[et_pb_section fb_built=”1″ _builder_version=”3.27.3″][et_pb_row column_structure=”1_4,3_4″ _builder_version=”3.27.3″][et_pb_column type=”1_4″ _builder_version=”3.27.3″][et_pb_image src=”https:\/\/www.icsr.co.uk\/wp-content\/uploads\/2020\/08\/Case-study-image-25-1-scaled.jpg” alt=”Case study image” title_text=”Case study image” _builder_version=”4.5.1″][\/et_pb_image][\/et_pb_column][et_pb_column type=”3_4″ _builder_version=”3.27.3″][et_pb_text _builder_version=”4.5.1″]<\/p>\n

Support Preparing For Introduction of Operational Resilience Planning<\/h1>\n

[\/et_pb_text][et_pb_post_nav prev_text=”Previous case study” next_text=”Next case study” _builder_version=”4.5.1″ _module_preset=”default”][\/et_pb_post_nav][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=”3.27.3″][et_pb_column type=”4_4″ _builder_version=”3.27.3″][et_pb_text _builder_version=”4.5.1″]<\/p>\n

The Client\u2019s Needs<\/strong><\/p>\n

The client was a UK MGA subsidiary of a large German Insurer. As it transformed itself from monoline to a consumer facing business the client needed to review its\u2019 Business Continuity Plans and Disaster Recovery Plans ahead of the change and introduction of Operational Resilience.<\/p>\n

ICSR was engaged to assist. <\/p>\n

ICSR\u2019s Solution<\/strong><\/p>\n

ICSR provided the following:<\/p>\n